[VIEWED 5696
TIMES]
|
SAVE! for ease of future access.
|
|
|
Indulgent1109
Please log in to subscribe to Indulgent1109's postings.
Posted on 11-13-09 6:07
PM
Reply
[Subscribe]
|
Login in to Rate this Post:
0
?
|
|
Its a 112 Km fast tract Highway project which will link Nijgadh (BARA) to Kathmandu, also includes 1.5 Km tunnel and A new international Airport.
Much Needed Highway project has been approved and under construction. Am really excited and just wanna share info. with you guys. Please follow the link for more info: Cheers!
Cheers!
|
|
|
|
Sand_deep
Please log in to subscribe to Sand_deep's postings.
Posted on 11-13-09 8:21
PM
Reply
[Subscribe]
|
Login in to Rate this Post:
0
?
|
|
|
|
|
ShaKEEn
Please log in to subscribe to ShaKEEn's postings.
Posted on 11-15-09 12:26
AM
Reply
[Subscribe]
|
Login in to Rate this Post:
0
?
|
|
ummm. i might have to go back to nepal after i get my architecture degree. m pretty interested in helping nepal's infrastructure and urban planning, and of course building actual buildings. anybody know any architecture firms?
|
|
|
naivelyStupid
Please log in to subscribe to naivelyStupid's postings.
Posted on 11-15-09 4:14
AM
Reply
[Subscribe]
|
Login in to Rate this Post:
0
?
|
|
I think it would be better to have train link connecting Kathmandu with the proposed international airport, rather than this road. What about Pharping-Hetauda and Banepa-Bardibas roads? Don't know the details, but Pharping Hetauda road is perhaps operational now, they could have upgraded it. There also used to be rumours about Bagmati corridor, and KP Bhattarai used to talk about some tunnel link. Maybe there are lots of options. Also, seems that the economic activity along the Prithvi Highway will have the fate of the Tribhuvan Highway in a few years, or maybe for travel upto Bharatpur, it might remain preferable.
|
|